PROJECT: CONSTRUCTION WORK – GREY STRUCTURE & FINISHING WORK


1. GREY STRUCTURE WORK

Site Preparation

- Site clearing and leveling
- Layout marking according to approved drawings
- Excavation for foundations

Foundation Work

- PCC (Plain Cement Concrete)
- Footings and foundations
- Foundation walls and damp proof course (DPC)

Structural Frame

- Columns
- Beams
- Slabs
- Reinforcement steel according to structural design
- Concrete casting and curing

Masonry Work

- Brick/block masonry walls
- Internal and external walls
- Cement mortar work

Roof Structure

- Roof slab casting
- Water tank structure
- Staircase construction

Services in Grey Structure

- Electrical conduits
- Plumbing sleeves and pipelines
- Drainage pipes

2. FINISHING WORK

Plaster Work

- Internal plaster
- External plaster
- Surface leveling

Flooring

- Tiles installation
- Marble/granite flooring
- Skirting work

Ceiling Work

- False ceiling installation
- Gypsum ceiling

Doors and Windows

- Aluminum/wooden doors
- Window installation
- Hardware fittings

Paint and Decoration

- Wall putty
- Primer coat
- Interior and exterior paint

Electrical Finishing

- Switches and sockets
- Lights and fixtures
- Distribution board installation

Plumbing Finishing

- Sanitary fittings
- Wash basins
- Kitchen fittings
- Water supply fixtures

Final Completion

- Cleaning and inspection
- Testing of electrical and plumbing systems
- Handover of project

Prepared By:
Chaudhary Group of Consultants 03088882524

Project Gallery

Explore more projects by Chaudhary Group of Consultants

IMPORTANT DISCLAIMER

Disclaimer: Tameer.ai only connects buyers and sellers and is not responsible for disputes, fraud, accidents, damages, payment issues, poor workmanship, or any losses from dealings between users.