PROJECT: CONSTRUCTION WORK – GREY STRUCTURE & FINISHING WORK
1. GREY STRUCTURE WORK
Site Preparation
- Site clearing and leveling
- Layout marking according to approved drawings
- Excavation for foundations
Foundation Work
- PCC (Plain Cement Concrete)
- Footings and foundations
- Foundation walls and damp proof course (DPC)
Structural Frame
- Columns
- Beams
- Slabs
- Reinforcement steel according to structural design
- Concrete casting and curing
Masonry Work
- Brick/block masonry walls
- Internal and external walls
- Cement mortar work
Roof Structure
- Roof slab casting
- Water tank structure
- Staircase construction
Services in Grey Structure
- Electrical conduits
- Plumbing sleeves and pipelines
- Drainage pipes
2. FINISHING WORK
Plaster Work
- Internal plaster
- External plaster
- Surface leveling
Flooring
- Tiles installation
- Marble/granite flooring
- Skirting work
Ceiling Work
- False ceiling installation
- Gypsum ceiling
Doors and Windows
- Aluminum/wooden doors
- Window installation
- Hardware fittings
Paint and Decoration
- Wall putty
- Primer coat
- Interior and exterior paint
Electrical Finishing
- Switches and sockets
- Lights and fixtures
- Distribution board installation
Plumbing Finishing
- Sanitary fittings
- Wash basins
- Kitchen fittings
- Water supply fixtures
Final Completion
- Cleaning and inspection
- Testing of electrical and plumbing systems
- Handover of project
Prepared By:
Chaudhary Group of Consultants 03088882524
Project Gallery







Explore more projects by Chaudhary Group of Consultants
IMPORTANT DISCLAIMER
Disclaimer: Tameer.ai only connects buyers and sellers and is not responsible for disputes, fraud, accidents, damages, payment issues, poor workmanship, or any losses from dealings between users.