
Villa Apparment Finishing Work
About project
The Finishing Works for 5 Marla Villa Apartments at Capital Smart City (Block M / Harmony Park) focus on the complete finishing work of 12 Apartments across a Ground + 2 Floors + Mumty layout. This project transitions raw grey structure units into fully finished, turnkey residential properties through high-grade material installations and precise craftwork.
- Wood Work & Joinery covers solid main entrance doors, semi-solid internal doors, custom MDF kitchen cabinets, and built-in bedroom wardrobes.
- Aluminium Work includes heavy-duty powder-coated aluminium window profiles with tempered glass panes and sliding mosquito screens.
- MS Work (Mild Steel) delivers balcony, Stair railing, and Mumty Doors.
- Paint Work involves weather-shield coatings on exterior elevations, smooth wall putty, and interior emulsion paint for walls and ceilings of Nippon Paint.
- Sanitary Work includes porcelain water closets, vanity washbasins, chrome-plated mixers, shower sets, and stainless steel kitchen sinks connected to pre-laid lines.
- Electric Work covers modular switches, power sockets, distribution boards with circuit breakers, LED light fixtures, ceiling fans, and terminal wiring for AC units.
- Marble Work features cut-to-size marble or granite treads/risers for internal and Mumty staircases, door thresholds, and granite kitchen counters.
- Tile Work delivers porcelain/ceramic floor tiling in living areas, anti-skid floor tiles in baths, balconies, and washing areas, and glazed wall tiles up to lintel height in wet zones.
Project Gallery







Explore more projects by Associates Engineering Services
IMPORTANT DISCLAIMER
Disclaimer: Tameer.ai only connects buyers and sellers and is not responsible for disputes, fraud, accidents, damages, payment issues, poor workmanship, or any losses from dealings between users.




